History

___________________________
EPG-Calc 6.1.7 (05-06-2019)
  .csv file upload removed, induced server error
  tooltips reprogrammed for browser compatibility
___________________________
EPG-Calc 6.1.6 (2016-09-02)
  mail and server addresses updated
___________________________
EPG-Calc 6.1.5 (2015-02-10)
  tooltips added on the upload page (screen 2)
___________________________
EPG-Calc 6.1.4 (2015-01-28)
  added parameters minimum (mn_phase) and maximum (mx_phase) for the phases: NP, Pr, C, F, G, sE2, id11 and id12
  added parameter minimum (mn_phase) for the phases: sgE1, frE1, E1, E12 and E2
___________________________
EPG-Calc 6.1.3 (2014-08-05)
  optimization of calculus algorithms and emails sending
___________________________
EPG-Calc 6.1.2 (2014-03-27)
  automated management of user accounts
___________________________
EPG-Calc 6.1.1 (2014-03-14)
  user interface modifications
___________________________
EPG-Calc 6.1 (2013-02-08)
  management of species with non conventional characteristics and sequence of EPG waveforms
___________________________
EPG-Calc 6.0 (2012-10-30)
  management of the user defined "11" and "12" phases
___________________________
EPG-Calc 5.1.3 (2012-06-16)
  management of multiple experimental classes uploads for EPG-Calc
___________________________
EPG-Calc 5.1.2 (2012-05-12)
  correction of a management error of Stylet+ (.ANA) files generated by the hidden included characters
___________________________
EPG-Calc 5.1.1 (2011-04-07)
  management of the files with upper case extension (.ANA, .CSV, .ZIP)
___________________________
EPG-Calc 5.1 (2011-04-05)
  management of the files analysed with "Stylet+"
  management of .zip archives allowing to upload in one go all the files of one experimental class
___________________________
EPG-Calc 5.0 (2011-02-15)
  upload .xls files removed for errors in digit precision
  correction of management errors of various parameters
  output improvement : pd parameters appear only if pd are measured
  variables renamed according to the others available utilities (see variables list)
  improved file management on the server
  suppressed parameters :
      - time to the 1st E2
      - time to the 1st sE2
      - maximal duration of a E1
      - time from the 1st E1 to the 1st E2
      - time from the 1st E1 to the 1st sE2
      - total duration of E2 before the 1st sE2
      - total duration of E1 before the 1st sE2
      - mean duration of E2 before the 1st sE2
  new parameters :
      - tC>1E/1Pr : time to the 1er E within the 1st Pr containing E
      - a_tC>1E/Pr : mean time to the 1st E within Pr containing E
      - mn_tC>1E/Pr : minimum time to the 1st E within Pr containing E
      - n_bPr>1E : number of brief Pr before the 1st E
      - n_bPr<1sE2 : number of Pr after the 1st sE2
      - %_E2/C : E2/C ratio (phloem index)
      - %_E1/allE : E1/E ratio (E1 index)
      - n_frE1/n_E12: E fraction index
      - t>1pd : time to the 1st pd from the 1st Pr
      - t>1pd/Pr : time to the 1st pd from the 1st Pr containing pd
      - a_t>1pd/Pr : mean time to the 1st pd for all Pr
      - m_t>1pd/Pr : median time to the 1st pd for all Pr
      - mn_t>1pd/Pr : minimum time to the 1s pd for all Pr
      - n_pd/minC : number of pd per minute of C
      - n_pd/1Pr : number of pd in the 1st Pr
      - n_Pr>1pd : number of Pr before the 1st pd
      - s_pdII-3/5pd : total duration of II.3 phases of the 5 1st pd
      - %_E2/Tr : % aphids with E2 (per treatment, not per individual)
      - %_sE2/Tr : % aphids with sE2 (per treatment, not per individual)
___________________________
EPG-Calc 4.9 (2009-11-10)
  checking the data file returns an error message when the first index ≠ 2
___________________________
EPG-Calc 4.8 (2009-04-15)
  correction of a management error of missing data for the parameters fE1fP and fE12fP
  correction of a management error of the parameter fE2
___________________________
EPG-Calc 4.7 (2009-01-22)
  added parameters:
  fpd : time to the first pd
  dpd : duration of the first pd
  d2pd : duration of the 2nd pd
  5dpd : mean duration of the five first pd
___________________________
EPG-Calc 4.6 (2008-12-18)
  added parameters:
  fG : time to the 1st G
  fGfP : time from the 1st probe to the 1st G
  nbPfG : number of probes before the 1st G
___________________________
EPG-Calc 4.5 (2008-12-10)
  correction of a management error of missing data at the table last line
  correction of a management error of the session variable "FromIndex"
___________________________
EPG-Calc 4.4 (2008-10-02)
  added parameters:
  nbE : number of E phases (single E1 + E1 fractions + E2)
  SE : total duration of E phases
  fE2s : time to the 1st sustained E2
  nbP_fE2 : number of probes after the 1st E2
___________________________
EPG-Calc 4.3 (2008-05-05)
  added parameters:
  nbNP : number of NP
  MNP : mean duration of a NP
  MdNP : median duration of NP
  nbPbr : number of brief P (< 3 min) before the 1st E
___________________________
EPG-Calc 4.2 (2008-04-14)
  ANA 3.4 software analysed files management
___________________________
EPG-Calc 4.1 (2008-02-16)
  correction of a management error of missing data
__________________________
EPG-Calc 4.0 (2008-02-06)
  parameters calculation from the first probe (session variable "FromIndex")
__________________________
EPG-Calc 3.3 (2007-12-15)
  management of MS-Excel files sending
__________________________
EPG-Calc 3.2 (2007-12-12)
  management of .csv files upload
__________________________
EPG-Calc 3.1 (2008-11-15)
  correction of a upload management error of MS-Excel files
__________________________
EPG-Calc 3.0 (2008-11-02)
  management of upload of MS-Excel files
__________________________
EPG-Calc 2.2 (2007-06-12)
  management of registrations
__________________________
EPG-Calc 2.1 (2007-04-29)
  management of missing data
__________________________
EPG-Calc 2.0 (2007-04-14)
  first php version developed from EPG-Calc 1 VBA software